Room |
Nature of repairs. |
3b |
Repaired (1926) holes broken through NW. ceiling, NE. and NW.
walls. |
3d |
Repaired (1926) platform at NW. end; holes broken through floor
and NE. wall from R. 58. |
58 |
Repaired (1926) hole through SW. wall to R. 3d (Pepper, 1920, pp.
220, 329). |
92 |
(2nd story of R. 97 or 3a) T-shaped door, NW. wall, 1926. |
110 |
See Rooms 3b, 3d, 58 above. |
158 |
Repairs to N. and W. walls, 1927. |
168 |
Repaired W. door, replaced lintels, 1925. |
169 |
SW. door: lintels and masonry above replaced, 1927; 3 NW. doors
rebuilt. |
185B |
SW. door repaired, 1927. |
227B |
Concrete floor placed, 1925, to protect ceiling of 227A. |
Kiva D |
Walls and surrounding rooms covered with concrete, April-May 1925,
as experiment in drainage control. |