590. Power Testing. [Lapham.]

10:30-1:30, Th. S.

The calibration and adjustment of gauges; calibration of thermometers,
planimeters, and indicators; valve setting; determination of clearances; flue


194

Page 194
gas analysis; steam quality tests; mechanical and thermal efficiency tests of a
steam engine; tests of a gasoline engine; test of the University Power Plant
boilers. (Fall.)