RIGHT OF WAY ACROSS "BROMPTON"

Dr. Combs stated to the Board that an additional right of way across the "Brompton" property
was needed by the Virginia Electric and Power Company for construction of a new transmission line.
The following conditions for construction of the right of way were specified by Stone and Webster
Engineering Corporation as agent for the Power Company:

This is to confirm our verbal offer of $4,500.00 for the additional 75 foot width
of right of way adjacent and parallel on the West side of our present 100 foot right
of way on the University of Virginia property in Spotsylvania County, Virginia.

"We agree to place our new structures opposite the existing structures on this line
and will not place any structures in the fairways on the golf course. The existing
single pole 13,200 volt line on this right of way will remain in its present location."

The following resolution was adopted:

RESOLVED by the Board of Visitors of The Rector and Visitors of the University of Virginia
that Mary Washington College be and it is hereby authorized to sign an agreement in the amount of
forty-five hundred dollars ($4,500.00) with the Virginia Electric and Power Company increasing the
existing easement across the "Brompton" property by an additional seventy-five (75) feet, in accordance
with the terms and conditions set forth in their communications dated September 5, 1950 and September
6, 1950.

- - -

On motion the meeting was then adjourned.

Barron F. Black
Rector
Vincent Shea
Secretary