The code of the city of Charlottesville, Virginia, 1965 : the charter and the general ordinances of the city |
I. |
II. |
I. |
II. |
I. |
II. |
III. |
IV. |
V. |
VI. |
VII. |
VIII. |
IX. |
X. |
X-A. |
X-B. |
XI. |
XII. |
XII-A. |
XIII. |
XIV. |
XV. |
XVI. |
XVII. |
XVIII. |
XIX. |
XX. |
XXI. |
XXII. |
XXIII. |
I. |
II. |
III. |
IV. |
V. |
VI. |
VII. |
VIII. |
IX. |
28. |
29. |
30. |
31. |
X. |
X-A. |
X-B. |
XI. |
XII. |
XII-A. |
XIII. |
XIV. |
XV. |
XVI. |
XVII. |
XVIII. |
XIX. |
XX. |
XXI. |
XXII. |
XXIII. |
CHAPTER 14. The code of the city of Charlottesville, Virginia, 1965 : | ||
Sec. 14-15. Responsibility for installations.
All gas connections from gas mains downstream to and
including the meter shall be installed by the city at its own
expense. All service pipes from the meter to the fixtures shall be
installed at the expense of the owner or consumer, by or under the
supervision of a master plumber or master gas fitter. The gas
superintendent shall have the authority and responsibility to
determine the location of all lines downstream to and including
the meter. (Code 1959, § 14-15; 3-17-75, § 1.)
CHAPTER 14. The code of the city of Charlottesville, Virginia, 1965 : | ||