University of Virginia Library

Search this document 
  
  
  
  
  
  
  
  
collapse section 
  
  

collapse section 
  
  
  
collapse section 
  
  
  
  
  
collapse section 
  
collapse section 
  
  
  
  
  
  
  
  
  
collapse section 
  
  
collapse section 
  
collapse section 
  
collapse section 
  
  
  
  
  
  
  
collapse section 
  
  
  
  
  
collapse section 
collapse section 
  
collapse section 
  
collapse section 
  
  
  
collapse section 
  
  
  
  
  
collapse section 
  
collapse section 
 I. 
collapse sectionII. 
  
 III. 
collapse section 
  
collapse section 
  
collapse section 
 I. 
 II. 
collapse sectionIII. 
  
collapse section 
  
  
collapse section 
  
  
collapse section 
  
collapse section 
  
  
  
  
collapse section 
  
collapse section 
  
collapse section 
  
collapse section 
  
collapse section 
  
  
collapse section 
 I. 
collapse sectionII. 
  
collapse section 
  
  
  
  
  
collapse section 
  
collapse section 
  
  
collapse section 
 I. 
 II. 
 III. 
  
  
collapse section 
  
collapse section 
  
  
  
collapse section 
  
  
  
  
  
  
  
collapse section 
  
  
  
  
  
  
  
collapse section 
  
  
  
  
  
collapse section 
 I. 
 II. 
 III. 
  
  
  
collapse section 
  
  
  
  
  
  
collapse section 
 I. 
  
collapse section 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
collapse section 
  
  
  
  
  
collapse section 
 1-2-3. 
 4-5-6. 
 10-11-12. 
 13-14-15. 
 16-17-18. 
 21-22-23. 
 26. 
 31-32-33. 
 34-35-36. 
 40-41-42. 
collapse section 
 100. 
 106. 
 107. 
 108-109-110. 
 111. 
 158-159-160. 
collapse section 
 200-201-202. 
 250-251-252. 
 259. 
collapse section 
 300-301-302. 
 350-351-352. 
 303-304-305. 
 353-354-355. 
 309-310-311. 
 359-360-361. 
 312-313-314. 
 362-363-364. 
 315-316-317. 
 365-366-367. 
 318-319-320. 
 368-369-370. 
 324-325-326. 
 340-341-342. 
 386-387-388. 
collapse section 
 400-401-402. 
 450-451-452. 
 403-404-405. 
 453-454-455. 
 406-407-408. 
 456-457-458. 
 409-410-411. 
 459-460-461. 
 412-413-414. 
 462-463-464. 
collapse section 
 521. 
 522. 
 523. 
 524. 
 525. 
 526. 
 527. 
 528. 
 529. 
 541-542-543. 
collapse section 
 650. 
 661. 
 662. 
 663. 
 670. 
 680. 
 690. 
 691. 
 692. 
collapse section 
 701. 
 703. 
 705. 
 707. 
 715. 
 716. 
 718. 
 719. 
 720. 
 721. 
 722. 
 725. 
collapse section 
 751. 
 755. 
collapse section 
 800. 
 801. 
 802. 
 803. 
 804. 
 805-806-807. 
 810. 
 811. 
 812. 
 818. 
 820-821-822. 
collapse section 
 865. 
 866. 
collapse section 
 900. 
 901. 
 902. 
 903. 
 904. 
 905. 
 906. 
 907. 
 910. 
 911. 
 920. 
 925. 
 930-931-932. 
 940-941-942. 
collapse section 
 950-951. 
 953-954-955. 
 956. 
 960-961. 
 975. 
 980-981. 
 990-991-992. 
  
  
  
  
  
  
  
  
  
  
  
  
FIELD WORK IN CIVIL ENGINEERING
  
  
collapse section 
  
  
  
  
  
  
collapse section 
collapse section 
collapse sectionI. 
 I. 
 II. 
 III. 
 IV. 
 V. 
 VI. 
collapse sectionII. 
  
  
  
  
  
collapse section 
  
  
  
  
  
  
  
  
  
  
  
  
collapse section 
  
  
  
  
  
  
  
  
  
  
collapse section 
  
  
  
  
  
  
  
  
collapse section 
  
  
collapse section 
  
collapse section 
  
  
  
  
  
  
collapse section 
  
  
  
collapse section 
  
  
collapse section 
  
collapse section 
  

  
  
  
collapse section 
  
  
  

FIELD WORK IN CIVIL ENGINEERING

The outfit of field instruments contains compasses, transits, and levels
of various approved makes; a solar transit, furnished also with stadia wires
and gradienter for tachymetric work; a Gurley mining transit, one of the
finest products of the instrument maker's art; a complete Gurley transit,
graduated to 30 seconds, with solar attachment; hand-levels and clinometers
for field topography; plane tables; a sextant; together with an adequate
supply of leveling rods, telemeter rods, signal poles, chains, tapes, pins,
and so on. For hydraulic surveys a hook gauge and a current meter are
provided. All students are instructed in the theory and adjustments of the
field instruments and in their practical use in the field. They are also required
to make up their field-books in standard forms; to reduce their


286

Page 286
surveys and execute all the necessary profiles, plans and maps; and to
determine lengths, areas, and volumes both from the maps and from the
original notes. Polar planimeters are provided for facilitating such estimates,
and a pantograph for making reduced copies of finished drawings.