D. APPENDIX D

PARTIAL LIST OF WALL REPAIRS AT PUEBLO DEL
ARROYO MADE BY THE NATIONAL GEOGRAPHIC
SOCIETY'S PUEBLO BONITO EXPEDITION

By HENRY B. ROBERTS

                                                 

213

Page 213
                                         
9 A  N. wall: Replaced lintels N. door, repaired upper jambs and 3 sq. ft.
above; 6-sq.ft. patch 15 ft. from NE. corner. 
S. door: Replaced 2 lintels, repaired upper W. jamb and 1 ft. above,
also sill and 10 inches below. 
W. door into Room 8: Replaced lintels, repaired jambs and 1 ft. above. 
9 B-I  Outer S. side: Ventilator jambs; minor patches at floor level, replaced
door lintels and surrounding 20 sq. ft. above Room 5. 
9 B-II  E. wall: Rebuilt part of wall on new supporting beams. 
Outer S. side: 3-sq.-ft. patch in middle and repairs at floor level above
Rooms 3-4. 
10 B  N. floor offset, entire length: Placed new beams under E. wall and
rebuilt upper 2 ft. 
S. door: Repaired as T-shaped, with outside patching about door and
at floor level above Room 6-7. 
11 B  N. floor offset and 35 sq. ft. above door: Replaced 2 beams supporting
E. wall and rebuilt 3 ft above. 
Outer S. side: 3-sq.-ft. patch at W. end and rebuilt top 2 ft. of wall. 
12 A  N. wall: Patched recent hole broken through upper W. end. 
E. wall: 2-sq.-ft. patch. 
18 B  W. side: 30 sq. ft. along and below floor offset; beam reset. 
W. side: Along floor offset for 10 ft. 
— B  Unnumbered room next N. of 18, E. door: Upper jambs and 3 lintels. 
W. door: Small patch on S. jamb. 
N. wall: 3-sq.-ft. patch; floor offset and 12 sq. ft. above. 
19 B  Middle S. wall: 6-sq.-ft. patch; 2 beam holes repaired. 
S. door: Sill, E. jamb, lintels and 3 sq. ft. above. Minor repairs along
floor offset. 
23 B  N. door: Upper jambs, lintels, and 5 sq. ft. above to third story floor
offset. 
26 B  W. door: Jambs, lintels, and 4 sq. ft. above. 
27 B  W. door: Floor offset to sill, both jambs repaired, 5 new lintels, and
6 sq. ft. above. 
S. door: New lintels and upper 6 inches of jambs. 
28 B  W. wall: 2 sq. ft. at middle of floor offset; new door lintels and patch
above. 
W. wall: 6-sq.-ft. patch floor level to door sill. 
29 B  E. door: N. jamb, upper half S. jamb, lintels, and 9 sq. ft. above. 
31 C  W. door: Lower jambs, sill, 4-sq.-ft. patch above. 
32 B  W. door: Upper S. jamb, 1 new lintel pole. 
34 B  E. door: Repaired about lintels, new sill, lower jambs. 
N. wall: 16-sq.-ft. patch. 
35 B  S. wall: Patches around ventilators, beam holes, and along floor offset. 
W. door: New sill, lower jambs repaired; 16-sq.-ft. patch S. of door. 
41 B  W. wall: Upper 3 ft. rebuilt. 
42 A  W. wall: Beam holes repaired. 
W. wall: Floor offset and 36-sq.-ft. patch above. 
43 B  E. wall: Minor patches along floor offset, rebuilt 2 ft. of wall above
offset. 
44 A  W. door: Minor patches on jambs. 
E. door: Jambs and stairs repaired. 
S. wall: Patched recent hole broken near W. end. 
45 B  W. wall: 9-sq.-ft. patch, ceiling poles reset. 
51 A  W. wall: 16 sq. ft. repaired, beams reset. 
52 A  W. wall: 2 ft. rebuilt; new lintels over opening into Room 51. 
Kiva C  E. half of wall built up about 3 ft. 
Court  N. side: New wall facing to and above Kivas H and I. 
S. side: New ventilator lintels and various patches, second and third
stories. 
Refaced outer E. wall of unnumbered NE. corner room, S. wing,
second story and part of third. 